Installation and commissioning of multifunctional extraction tank equipment
Installation and commissioning of multifunctional extraction tank equipment
Xiangpai Machinery will explain to you today.
Installation and commissioning of multifunctional extraction tank equipment
1) Install the equipment according to the requirements of the process, and ensure that the equipment is vertical; the lugs and platform snails
The bolt connection should be firm and reliable; the connecting pipes are neat and beautiful, the seal is reliable, and there must be no leakage; each pneumatic element
The connecting hose of the piece should be intercepted by special tools to ensure that the section is flush, otherwise it will cause air leakage.
2) Install pressure gauge, full-open spring-type safety valve, diameter DN15, take-off pressure is not higher than the rated pressure 0.015Mpa,
And regularly calibrated according to regulations. The condensate drain should use a steam trap (heat-type steam trap) and observe the hydrophobic
Drainage to prevent poor drainage and air leakage. If the heating jacket has a sound, it means there is water in it, it should be opened.
After the water bypass valve is drained, stop heating and check if the steam trap is clogged.
3) After the equipment is installed, it is necessary to test the equipment before putting it into production. First open the compressed air valve
(This valve is provided by the user), check whether the slag door action is reliable: whether the slag door opening and closing is free, whether there is
Enthusiasm, stuck phenomenon; whether the electrical interlock is effective (requires that the slag cylinder can not move and slag discharge when locked)
When the cylinder is in the open state, the locking cylinder cannot be locked). Then check that the equipment's pipeline is clear, and the valves are open.
Whether the clearance is flexible. Finally, the water in the tank is extracted to the weld of the upper head to check whether there is leakage at the seal of the slag door. The multi-function extraction tank equipment can be put into production after everything is normal.
Sodium Ethoxide CAS No.141-52-6
Sodium Ethoxide Basic Information
CAS: 141-52-6
MF: C2H5NaO
MW: 68.05
EINECS: 205-487-5
Mol File: 141-52-6.mol
Sodium Ethoxide Structure
Melting point 260 °C
Boiling point 91°C
density 0.868 g/mL at 25 °C
vapor density 1.6 (vs air)
vapor pressure <0.1 mm Hg ( 20 °C)
storage temp. Store at R.T.
solubility Soluble in ethanol and methanol.
form Liquid
PH 13 (5g/l, H2O, 20℃)
Water Solubility Miscible
Stability: Reacts violently with acids, water. Incompatible with chlorinated solvents, moisture. Absorbs carbon dioxide from the air. Highly flammable.
Sodium Ethoxide,Sodium Ethoxide Formula,Sodium Ethoxide Structure,Sodium Methoxide Formula,Sodium Ethoxide In Ethanol Oxide Density
Shandong YingLang Chemical Co.,Ltd , https://www.sdylhgtrade.com